Western Australia battery rebate

Federal rebate plus the WA Residential Battery Scheme rebate. A 13.5 kWh battery installed in WA by 31 December 2026 gets about $4,576 to $7,440 in total: federal $3,276 to $3,640 plus $1,300 or $3,800 from the WA scheme (Synergy or Horizon Power).

What you can get in WA

Usable kWhFederal, by 31 Dec 2026WA extraTotalFederal from 1 Jan 2027
5$1,224 to $1,360$650 or $1,900$1,874 to $3,260$1,008 to $1,120
10$2,448 to $2,720$1,300 or $3,800$3,748 to $6,520$2,052 to $2,280
13.5$3,276 to $3,640$1,300 or $3,800$4,576 to $7,440$2,736 to $3,040
20$4,284 to $4,760$1,300 or $3,800$5,584 to $8,560$3,600 to $4,000
30$5,544 to $6,160$1,300 or $3,800$6,844 to $9,960$4,644 to $5,160

Paid per kWh of usable capacity up to 10 kWh: up to $1,300 for Synergy customers and up to $3,800 for Horizon Power customers. You must join a virtual power plant. A loan of up to $10,000 over 10 years is available to households earning under $210,000.

WA Residential Battery Scheme

  • Battery must have at least 5 kWh of usable capacity and be on the Clean Energy Council approved list and your utility's Supported Solution List.
  • Joining a virtual power plant (VPP) is mandatory. Horizon Power customers must join Horizon Power's VPP.
  • You must hold a Synergy or Horizon Power account for the property.
  • The seller must be a New Energy Tech approved seller with a WA address, and applies on your behalf. The rebate can't be claimed after installation.
  • Loan option: up to $10,000 over 10 years for households earning under $210,000.
  • The scheme runs until 100,000 rebates are paid, expected to be some time in 2027.

Federal rebate rules that apply in every state

  • The battery must be new, and installed as a single job.
  • Battery must be on the Clean Energy Council approved battery list at the time of installation.
  • Battery must be paired with a new or existing solar PV system of no more than 1 MW.
  • Battery must be capable of joining a virtual power plant (grid-connected, or off-grid within 1 km of the grid).
  • Installer must be Solar Accreditation Australia (SAA) accredited with a battery endorsement.
  • Only one battery system per premises (per NMI for grid-connected systems).
  • The battery must stay at the property until the end of its warranty or the end of 2030, whichever is later.
  • The rate depends on the install date, not when you sign. Technically it's the date the battery's electrical safety compliance certificate is issued.